Like us on facebook for Air Conditioning service in Westerville OH Follow us on Twitter and let us know how pleased you are with your AC service near Lewis Center OH Find us on Google and have us service your Air Conditioning in Columbus OH Subscribe to our YouTube channel for AC repair & maintenance tips in Westerville OH Find us on yelp for great Air Conditioner repair service in Lewis Center OH

OSHA Construction Standards for Grounding

Trust our technicians to deliver elite service and expertise on your furnace or AC service For AC repair in the Columbus and Central Ohio area, contact Cullins One Hour Heating and Air Conditioning today!repair, or maintenance in the Columbus and Central Ohio area.
We have certified technicians and trucks ready to handle any unit installation or replacement For Air Conditioner installation near in the Columbus and Central Ohio area, schedule service with Cullins One Hour Heating and Air Conditioning!you have in the Columbus and Central Ohio area.
Click Here to view our current sales and promotions to see how you can save on your upcoming repairCullins One Hour Heating and Air Conditioning offers coupons for your Air Conditioning repair in the Columbus and Central Ohio area!. in in the Columbus and Central Ohio area!

Grounding

The term "ground" refers to a conductive body, usually the earth. "Grounding" a tool or electrical system means intentionally creating a low-resistance path to the earth. When properly done, current from a short or from lightning follows this path, thus preventing the buildup of voltages that would otherwise result in electrical shock, injury and even death.

  • System or Service Ground: In this type of ground, a wire called "the neutral conductor" is grounded at the transformer, and again at the service entrance to the building. This is primarily designed to protect machines, tools, and insulation against damage.There are two kinds of grounds; both are required by the OSHA construction standard:
  • Equipment Ground: This is intended to offer enhanced protection to the workers themselves. If a malfunction causes the metal frame of a tool to become energized, the equipment ground provides another path for the current to flow through the tool to the ground.

There is one disadvantage to grounding: a break in the grounding system may occur without the user's knowledge. Using a ground-fault circuit interrupter (GFCI) is one way of overcoming grounding deficiencies.

Grounding Requirements

  • Ground all electrical systems.
  • The path to ground from circuits, equipment, and enclosures must be permanent and continuous.
  • Ground all supports and enclosures for conductors.
  • Ground all metal enclosures for service equipment.
  • Ground all exposed, non-current-carrying metal parts of fixed equipment.
  • Ground exposed, non-current-carrying metal parts of tools and equipment connected by cord and plug.
  • Ground the metal parts of the following non-electrical equipment:
  • Frames and tracks of electrically operated cranes.
  • Frames of non-electrically driven elevator cars to which electric conductors are attached.
  • Hand-operated metal shifting ropes or cables of electric elevators.
  • Metal partitions, grill work, and similar metal enclosures around equipment of over 1kV between conductors.

Methods of Grounding Equipment

  • Ground all fixed equipment with an equipment grounding conductor that is in the same raceway, cable, or cord, or that runs with or encloses the circuit conductors (except for DC circuits only).
  • Conductors used for grounding fixed or moveable equipment, including bonding conductors for assuring electrical continuity, must be able to safely carry any fault current that may be imposed on them.
  • Electrodes must be free from nonconductive coatings, such as paint or enamel, and if practicable, must be embedded below permanent moisture level.
  • Single electrodes which have a resistance to ground greater than 25 ohms must be augmented by one additional electrode installed no closer than 6 feet to the first electrode.

Source: U.S. Dept. of Labor Office of Safety & Health Administration


(614) 890-0851
670 Radio Dr. Lewis Center, OH 43035
Like us on facebook for AC service in Westerville OHFollow us on Twitter and let us know how pleased you are with your AC service near Lewis Center OHFind us on Google and have us service your Air Conditioning in Columbus OHSubscribe to our YouTube channel for AC repair & maintenance tips in Westerville OHFind us on yelp for great Air Conditioner repair service in Lewis Center OH